"Last time we spoke with GBR, Osisko sat at 3.1 Moz gold, and now our most recent resource estimate brings Windfall to 6.1 Moz and still growing."

Mathieu Savard

PRESIDENT, OSISKO MINING

May 28, 2021

How has Osisko Mining evolved?

In 2015 (one year after the sale of the Canadian Malartic mine to Agnico Eagle and Yamana for C$4.3 billion) the new Osisko Mining was created to continue where the first Osisko left off.  Following a succession of deals, we initiated a 50,000 metre drill program at Windfall, and following the consistent and exceptional results, the program was increased to 1.5 million metres, making Windfall the fastest advancing project in Canada and probably globally. Last time we spoke with GBR, Osisko sat at 3.1 Moz gold, and now our most recent resource estimate brings Windfall to 6.1 Moz and still growing.  Windfall is now firmly in the “World-Class” category (over 5 Moz, over 8 g/t Au average grade) of high-grade gold deposits in size and grade.  This growth comes from the significant results we’ve had in the expansion of the Lynx zones that now represent over 60% of the resource base. Our recent highly positive preliminary economic assessment (PEA) results – which we believe are conservative – give a good insight into what Windfall could become in the near future. 

What did the recent PEA on Windfall reveal about the economics of the project?

The PEA outlines a very strong base case for a significant and highly profitable new gold mine in Québec. It provides a robust assessment for developing Windfall as a 3,100 tonne per day underground mine with a central processing mill at site.  During the first 7 years of full production Windfall is projected to produce an average of 300,000 oz Au per year at 8.1 g/t Au average diluted grade, with peak production of 328,000 oz Au in year six.  Assuming US$1,500/oz Au, the project's pre-tax IRR is 50.6% and pre-tax NPV is C$2.6 billion; after-tax NPV is C$1.5 billion, and after-tax IRR is 39.3%. The after-tax payback period is 2.2 years from start of production, with a low all-in sustaining cost (AISC) of US$610/oz Au. The initial capex is estimated at C$544 million and envisions the creation of 600 direct and indirect jobs during operation and 500 jobs during construction. These are strong numbers and we believe they will continue to improve as we complete our work and full feasibility study. Bear in mind that most of the published resource is located within the first 1,200 meters of vertical depth and that to date, mineralization has been traced down as far as 2,600 meters of vertical depth. Windfall has a bright future ahead with strong upside potential.

What are the characteristics of Windfall that make it an attractive project?

Being in Québec provides a safe geopolitical base with predictable laws and regulations, the availability of financial incentives, and firm support by the government and population.  Windfall is located on the traditional lands of the Cree community of Waswanipi, who along with the Cree First Nation Government have shown strong support for the project.  We have a large contingent of workers on the Windfall project from the First Nation communities and we are working hard to be a role model for natural resource development with our Cree partners.

What are your views on the current gold price environment?

The fundamentals for gold remain strong and we believe we are headed into an increasing gold price environment.  Timing is everything in this business and during the heavy technical evaluation work over the past five years we have seen the price of gold head up from around US$1,200/oz when we started to today’s current price of US$1,800/oz. I think we are going to see a stronger gold price as we complete the feasibility and permitting, build the mine and get into production in 2024.

INTERVIEWS MORE INTERVIEWS

"We are not only replacing reserves as we mine but expanding them, which is rare in the industry."
"The priority at Red Lake is to achieve consistency and generate positive cash flow with a margin on every ounce."
"At present, much of our work in KSA focuses on early-stage exploration and resource evaluation simply because the industry has not yet reached the more advanced stages."
"I anticipate greater support for North American supply chains. For example, Ontario is investing over C$40 billion in midstream and downstream EV development."

RECENT PUBLICATIONS

Latin America Petrochemicals and Chemicals 2024 - Digital Interactive

The Latin America Petrochemicals and Chemicals 2024 report, produced in alliance with APLA, explores the current state of these industries, the challenges they face, and the opportunities they offer.

MORE PREVIOUSLY PUBLISHED

MACIG

"With the increasing mining activity in Africa, it is fundamental to ensure that these minerals are produced more sustainably and timely manner."

SUBSCRIBE TO OUR NEWSLETTER