"One of the year's major successes was building three camps for 5,500 people for Collahuasi. It was our largest project to date and demonstrated our ability to overcome logistical challenges and deliver on time, within budget, and safely."
"Our two-year goal is to move from automation to autonomy. This means that our algorithms should be able to run industrial plants without human intervention."
"We plan to double our copper production by the end of the decade. There remains significant upside potential in the gold industry, and the copper operations are strategic and additive to that."
"Parametric modeling has revolutionized the industry, integrating various aspects into a single, efficient model, and drastically reducing project timelines."
"In June 2023 we received a permit to drill on the southern half of the Soledad project. This includes a porphyry target, referred to as Mega-Gold, and a high-sulfidation epithermal target called La Joya."